Concrete Slab Calculator

Enter the slab size and thickness. The result shows how much concrete to order as ready-mix or as bags, including a waste allowance. Use the same tool for patios, driveways, sidewalks and equipment pads — the geometry is identical.

Results update as you type.

Patios and walks are commonly 4 in; driveways 4–6 in. Follow your plans or local code.

%

Typical allowance is 5–10%. Use more for uneven subgrade.

Yields used: 40 lb ≈ 0.30 ft³, 50 lb ≈ 0.375 ft³, 60 lb ≈ 0.45 ft³, 80 lb ≈ 0.60 ft³.

$/yd³

Enter your local price. Prices vary by region and supplier.

How it’s calculated

  • Volume (ft³) = length (ft) × width (ft) × thickness (ft) × quantity
  • Cubic yards = ft³ ÷ 27
  • Order quantity = volume × (1 + waste %)
  • Bags = order volume ÷ bag yield, rounded up

Worked example

A 10 ft × 10 ft patio, 4 in thick, with 10% waste and 80 lb bags.

Inputs

Length
10 ft
Width
10 ft
Thickness
4 in
Number of identical slabs
1
Extra for waste and spillage
10 %
Bag size
80 lb bag
Ready-mix price per cubic yard
0 $/yd³

Results

Concrete to order (with waste)
1.36 cu yd
Net concrete volume
1.23 cu yd
Or bags of pre-mixed concrete
62 bags

Load this example into the calculator

Assumptions and limits

  • The slab is a rectangle with a uniform thickness.
  • Subgrade is level; low spots increase the real volume.
  • Bag counts use typical manufacturer yields for pre-mixed concrete. Check the yield printed on your bag.
  • Rebar, mesh and forms are not deducted (their volume is negligible).

Verify the result against the applicable local code, adopted code edition, manufacturer instructions and project requirements. See our methodology.

Questions

How much concrete do I need for a 10×10 slab?

At 4 inches thick, a 10 × 10 ft slab needs 33.3 ft³, which is about 1.23 cubic yards before waste. With 10% extra, plan on about 1.36 yd³ or 62 bags of 80 lb mix.

How much extra concrete should I order?

Most contractors add 5–10%. Uneven ground, soft subgrade or long forms justify the higher end. Running short mid-pour is far more costly than a small surplus.

What is a cubic yard of concrete?

A cubic yard is 3 ft × 3 ft × 3 ft = 27 cubic feet. Ready-mix is sold by the cubic yard.