Concrete Footing Calculator

Continuous footings and curbs are measured by total run length. Enter the combined length of all footing runs and the cross-section.

Important: Footing size and depth are structural and code-governed. Verify dimensions against your approved plans and local building department requirements.

Results update as you type.

Add up every run. At corners, count the overlap once.

%

Typical allowance is 5–10%. Use more for uneven subgrade.

Yields used: 40 lb ≈ 0.30 ft³, 50 lb ≈ 0.375 ft³, 60 lb ≈ 0.45 ft³, 80 lb ≈ 0.60 ft³.

$/yd³

Enter your local price. Prices vary by region and supplier.

Loading animation…

Watch it explained

A step-by-step video using your numbers: what to enter, what the result means, and a “what if” example. On-screen instructions follow each step as it happens.

Loading animation…
0:00 / 0:00

What the animation shows

The animation and the step-by-step video above use your numbers. Here is the same walkthrough written out for the default example.

Finished frame of the concrete footing calculator animation for the default example
The last frame of the animation for the default example.

What you enter

  • Total footing length: 60 ft. Add up every run. At corners, count the overlap once.
  • Footing width: 16 in.
  • Footing depth (thickness): 8 in.
  • Extra for waste and spillage: 10 %. Typical allowance is 5–10%. Use more for uneven subgrade.
  • Bag size: 80 lb bag. Yields used: 40 lb ≈ 0.30 ft³, 50 lb ≈ 0.375 ft³, 60 lb ≈ 0.45 ft³, 80 lb ≈ 0.60 ft³.

What happens, step by step

  1. Concrete runs along all 60 ft of trench as it is poured.
  2. The side view shows the 16 in × 8 in cross-section filling up.
  3. A long run is drawn folded into a rectangle of the same length.
  4. Length × width × depth, plus 10%, gives 2.17 cu yd.

The answer: concrete to order (with waste) is 2.17 cu yd.

How it’s calculated

  • Volume = total length × width × depth
  • Order = volume × (1 + waste %)

Worked example

60 ft of footing, 16 in wide by 8 in deep, 10% waste.

Inputs

Total footing length
60 ft
Footing width
16 in
Footing depth (thickness)
8 in
Extra for waste and spillage
10 %
Bag size
80 lb bag
Ready-mix price per cubic yard
0 $/yd³

Results

Concrete to order (with waste)
2.17 cu yd
Net volume
1.98 cu yd
Or bags
98 bags

Load this example into the calculator

Assumptions and limits

  • Rectangular cross-section along the whole run.
  • Required footing width, depth and frost depth are set by your local code and soil — this tool only computes volume.
  • Bag counts use typical manufacturer yields for pre-mixed concrete. Check the yield printed on your bag.

Verify the result against the applicable local code, adopted code edition, manufacturer instructions and project requirements. See our methodology.

Questions

How do I measure footing length at corners?

Measure along the centerline of the footing, or take outside lengths on two sides and inside lengths on the other two, so corners are not counted twice.

Can I use this for a concrete curb?

Yes. A straight curb is a rectangular cross-section along a length, the same as a strip footing.