Irrigation & Sprinkler Zone Calculator

Time how long it takes to fill a bucket from the outdoor spigot. Keep each zone below about 75% of that flow so pressure stays adequate.

Results update as you type.

s
%
gpm

From the nozzle chart at your pressure.

How it’s calculated

  • Available gpm = bucket gallons ÷ seconds × 60
  • Heads per zone = (available × usable %) ÷ head flow, rounded down
  • Precipitation rate (in/h) = 96.25 × total gpm ÷ area
  • Run time = target depth ÷ precipitation rate

Worked example

5 gal bucket fills in 30 s; 12 heads at 1.5 gpm covering 2,000 sq ft; apply ½ in.

Inputs

Bucket size
5 gal
Seconds to fill
30 s
Usable share of available flow
75 %
Sprinkler heads
12
Flow per head
1.5 gpm
Area watered by these heads
2000 sq ft
Water to apply
0.5 in

Results

Zones needed
3 zones
Available flow
10 gpm
Total head flow
18 gpm
Maximum heads per zone
5
Precipitation rate
0.87 in/h
Run time per zone for target
35 min

Load this example into the calculator

Assumptions and limits

  • Heads are spaced head-to-head with matched precipitation.
  • Pressure loss in the pipe is not modelled; a pressure gauge test is recommended.

Verify the result against the applicable local code, adopted code edition, manufacturer instructions and project requirements. See our methodology.

Questions

How many sprinkler heads per zone?

Divide the usable flow by each head’s gpm. With 10 gpm available and 75% usable, 1.5 gpm heads allow 5 per zone.

How long should I run sprinklers?

Divide the water depth you want by the precipitation rate. Most lawns need about 1 in per week, split into a few sessions.